15.40.1106.2 Methods of testing storm drainage systems.
This section is included in your selections.
Delete the first sentence of this section and substitute the following:
The piping of storm drain systems shall be tested upon completion of the rough piping installation by water or air and proved tight.
(Ord. 17-005 § 4, 2017)