Skip to main content
Loading…
This section is included in your selections.

All landscaping structural requirements (e.g., drainage, grading, concrete, rock or keystone bed structures, sidewalks) must be met at occupancy. Topsoil addition and final grading and seeding and all plantings of flora must be met within 12 months of occupancy, or within the first growing season after occupancy, whichever comes first. The owner, lessee, etc., shall continue to meet such requirements thereafter and replace all dead shrubs and trees to maintain the landscaping in good condition. (Ord. 21-005 § 6, 2021)