Skip to main content
Loading…
This section is included in your selections.

All significant users proposing to connect to or to contribute to the POTW shall obtain a wastewater discharge permit before connecting to or contributing to the POTW. All existing significant users connected to or contributing to the POTW shall obtain a wastewater contribution permit within 180 days after the effective date of the ordinance codified in this chapter. (Ord. 234 § 4.2.1, 1980)